Buvconsult

Built for factories

Buvconsult turns workers’ WhatsApp updates into structured production data—without introducing difficult software on the factory floor.

Precast concrete factory with production lines and an overhead crane

Actual time, costs, quality, and production variances in one journal.

01

Workers only need WhatsApp

No difficult integration, new software, or complicated forms—your team already uses WhatsApp as a communication tool.

Factory floor
WhatsApp
Production data

02

Turn drawings into structured data

Buvconsult automatically extracts the project name, element types, and required work from the drawing.

1Project
2Element
3Work type

03

Keep every type of work connected

Planned, additional, and unexpected work is captured in one flow and connected to the correct project.

Planned work
Additional work
Unexpected work

04

Turn voice updates into production records

A worker reports what they are doing; Buvconsult transcribes the message and organizes it by project, element, and work type.

Worker voice message

Project
Work type
Structured record

05

A quality-control flow for your QA team

Quality checks, photos, and approvals stay connected to the relevant element and production operation.

Quality check

Project
Element
Work type
Approved

06

Calculate every operation’s cost automatically

Actual labor time and completed quantities produce a clear cost for every task, element, and project.

m²
kg
t

Actual labor time

Actual cost

07

Implementation led by our team

We visit your factory, speak directly with your team, and adapt Buvconsult to your production workflow.

Factory visit01
Workflow setup02
Team onboarding03

Production visibility

From assumptions to actual costs

Compare production without structured reporting with the daily operational data captured by Buvconsult.

Without Buvconsult

  • No cost breakdown for a project.
  • Productivity is difficult to measure.
  • No data for estimation.
  • No clear benchmark for measuring worker performance.
  • Budget overruns only become visible when it is too late.
  • The same mistakes are made again.

With Buvconsult

  • Every hour of labor is accounted for.
  • Clear cost breakdown per m², kg, tonne, project, element, and work type.
  • Every delay or hindrance during production is recorded.
  • Clear time spent on each task is recorded.
  • Actual price data for future estimation.
  • Visibility for the project management team.
  • Estimates are compared with factual costs.